Newly built disc sealant system

Country
Germany
Range

New construction of a technical centre for disc sealant facility

Electrical design, switchgear construction, software production, commissioning and assembly

  • WSS adhesion and assembly of the front windscreen
  • HS gluing and assembling of the rear window
  • FSS bonding of the side panel, the shoring is done manually
  • AAS failure protection of the three installations, shoring is done manually

For further information, see the following article >>

Customer benefit
  • Automated installation of vehicle windows in low cycle time
  • Quality Improvement and cost optimisation through higher precision and less reworking
Disciplines
Electrical Engineering
Solutions
Contact